This guide walks through the calculation in the order an engineer would do it: the nightly load, the battery energy, the panel size, a stress test for consecutive low-sun days, and the data a supplier needs to check the result. The worked example uses hypothetical numbers to show the method. It is not a product specification and not a recommendation for any light.
The starting point is the energy the light uses each night. That depends on its operating profile, not on its rated power alone.
Take the power figures from the approved datasheet for the exact model, and the operating profile from the controller's programmed schedule. Ask how the figures were obtained and under what conditions. A rated power and a measured power at a dimmed stage are different numbers, and both matter.
Installation affects what the system actually receives and delivers. Shading, panel orientation and the mounting arrangement change the energy the panel harvests, and the road layout may change the dimming schedule the project needs. Confirm these before treating a datasheet figure as the site figure.
| Input | Unit | Source |
|---|---|---|
| Power at each operating stage | W | Exact model datasheet and controller schedule |
| Hours at each stage | h per night | Project requirement and dimming schedule |
| Operating days | days per week or per year | Project requirement |
| Sensor or presence-based behaviour | description | Controller specification |
| Seasonal change in night length | h | Site latitude and the project schedule |
Do not multiply the nominal wattage by every hour of the night if a validated dimming profile reduces the actual consumption. Use the profile the light will actually run.
Nightly energy (Wh) = sum over each stage of (power in W × hours at that power)
The battery has to cover the nightly energy for the required number of backup days, and only part of its nominal capacity is available to do it.
Work from the inputs below and write each one down, so a reviewer can challenge it:
Nominal battery energy (Wh) = nightly energy × autonomy days ÷ efficiency ÷ usable depth of discharge
Battery capacity in amp-hours follows from the nominal energy and the battery voltage: Ah = Wh ÷ V. Comparing batteries by Ah alone is not enough, because two batteries with the same Ah at different voltages hold different energy. Convert each to Wh, then compare usable energy, chemistry and operating limits.
.png)
The example below is illustrative. Every input is hypothetical and chosen only to show the method.
| Step (illustrative) | Calculation | Result |
|---|---|---|
| Nightly energy | (30 W × 4 h) + (15 W × 6 h) | 210 Wh per night |
| Energy over autonomy period | 210 Wh × 3 days | 630 Wh |
| Battery output required | 630 Wh ÷ 0.90 efficiency | 700 Wh |
| Nominal battery energy | 700 Wh ÷ 0.80 usable depth of discharge | 875 Wh |
| Equivalent capacity at 12.8 V | 875 Wh ÷ 12.8 V | about 68 Ah |
Changing a single assumption moves the answer. The table below holds the same nightly energy and efficiency and varies only autonomy days and usable depth of discharge, to show how sensitive nominal energy is to those two inputs.
| Autonomy days | Usable depth of discharge | Nominal battery energy (illustrative) |
|---|---|---|
| 2 | 70% | about 667 Wh |
| 2 | 90% | about 519 Wh |
| 3 | 70% | 1,000 Wh |
| 3 | 90% | about 778 Wh |
| 5 | 70% | about 1,667 Wh |
| 5 | 90% | about 1,296 Wh |
None of these numbers is a recommended battery size. They show why a supplier should state its autonomy and usable-capacity assumptions, and why you should compare candidate products on usable energy, not on a headline capacity. You can then compare your calculated need against the actual panel, battery and controller combinations among solar street light product configurations.
The panel must replace the energy used each day. The design condition is the worst period the system has to survive, not the annual average, because an average hides the months in which the battery runs down.
Required panel power (W) = daily energy to be replaced ÷ (worst-period sun hours per day × system efficiency)
Continuing the illustrative example, with 3.0 equivalent sun hours a day and an overall system efficiency of 0.70, the required panel is 210 ÷ (3.0 × 0.70) = 100 W.
.png)
| Assumption changed (illustrative) | Sun hours per day | System efficiency | Required panel |
|---|---|---|---|
| Base case | 3.0 | 0.70 | 100 W |
| Lower worst-month sun | 2.0 | 0.70 | 150 W |
| Higher losses | 3.0 | 0.60 | about 117 W |
| Better worst-month sun | 4.0 | 0.70 | 75 W |
The required panel changes a great deal with the site's solar data. That is why a generic ratio between panel wattage and LED wattage does not work, and why the project location is the first thing a supplier needs.
Autonomy is the number of days a fully charged system can keep the light on when solar input is poor or absent. It is not a promise about weather. It is a design target that must be checked against the site and the system.
Run the illustrative system through a few low-sun scenarios. The energy available to the load from the full battery is 875 Wh × 0.80 × 0.90 = 630 Wh. With a 100 W panel and the same 0.70 efficiency, the energy harvested on a poor day is 100 × sun hours × 0.70.
| Scenario (illustrative) | Daily harvest | Net draw per day | Days supported from full |
|---|---|---|---|
| No solar input | 0 Wh | 210 Wh | 3.0 |
| 0.5 sun hours per day | 35 Wh | 175 Wh | about 3.6 |
| 1.0 sun hours per day | 70 Wh | 140 Wh | 4.5 |
This simplified view shows how much the answer depends on the assumed harvest. It also exposes a second problem: recovery. In the base case the 100 W panel harvests 210 Wh a day, exactly the nightly load, so there is no surplus to refill the battery after a cloudy spell. With a 150 W panel and the same 3.0 sun hours, the harvest is 315 Wh a day and the surplus is 105 Wh, so refilling 630 Wh would take about six days. A system sized only to meet the load in the worst month can take a very long time to recover.
Regional conditions change the design inputs. For regional context, see the guides on solar street lights in rainy climate conditions and on solar street lights and monsoon requirements in Thailand. Treat any autonomy figure there as site and system specific, not as a universal guarantee.
Have your site assumptions ready? Send the project location, pole layout, nightly schedule, lighting power and dimming, required backup days and target quantity, and request a solar street light sizing review against the available configurations.
A supplier can only check a design against the data it is given. Put your assumptions into a short sizing brief so every quotation is built on the same inputs.
| Item | Information to provide |
|---|---|
| Project location | Country and city, so the worst-period solar resource can be chosen |
| Pole and road layout | Pole height, spacing and road width from the design |
| Night hours | Operating hours and any seasonal change |
| Dimming profile | Power at each stage and its duration |
| Backup days | The project requirement and how it is defined |
| Temperature range | Minimum and maximum site temperature |
| Specification | The lighting or tender requirement that applies |
| Quantity | Number of units and any phasing |
Ask the supplier to return the calculation, not only a product code. It should show the nightly energy, the battery energy and its usable fraction, the panel size, the efficiency and sun-hours assumptions, the controller type and dimming schedule, and the charge-temperature limits. Treat a preliminary check as a starting point, because a final engineering design needs site input that an enquiry may not contain.
If you want a supplier to review your own numbers, request a solar street light sizing review and send the sizing brief above.
Start with the nightly energy in Wh and multiply by the autonomy days. Then divide by the efficiency and by the usable depth of discharge, and add any stated margin for temperature and ageing. Keep the units and assumptions visible so the result can be checked.
No. Use the project specification, the local climate and an agreed reliability target. The number of days is only meaningful together with the battery, the panel and the site's low-sun conditions.
Not by itself. The site's solar resource, the orientation, shading, battery sizing, dimming and the load schedule all matter, and a larger panel does not remove them.
No. Convert voltage times Ah to nominal Wh, then compare usable energy, voltage, chemistry and operating limits.